• Post Date

Flight Ops Aboard the USS Kearsarge

07/19/2013
07/19/2013: A UH-1N Huey assigned to Marine Medium Tiltrotor Squadron (VMM) 266 (Reinforced), 26th Marine Expeditionary Unit (MEU), prepares to land on the flight deck of the USS Kearsarge (LHD 3) after conducting flight operations, at sea, July 13, 2013. [slidepress gallery='flight-ops-aboard-the-uss-kearsarge'] Credit:26th Marine Expeditionary Unit:7/13/13 The 26th MEU is…

Japan and Participation in F-35 Production

07/18/2013
2013-07-18 (Excerpts): The Japanese government has decided to allow domestic defense-related manufacturers to participate in production of U.S. F-35 stealth fighter jets for the Air Self-Defense Force, government sources said Wednesday. The government, which will sign contracts with the manufacturers in August, is aiming to solidify Japan-U.S. relations in the…

Lockheed Martin Delivers F-35 Targeting System

07/18/2013
2013-07-18 (Excerpts) Lockheed Martin recently delivered the 100th Electro-Optical Targeting System (EOTS) for the F-35 Lightning II. EOTS is the first sensor that combines forward-looking infrared and infrared search and track functionality to provide F-35 pilots with situational awareness and air-to-air and air-to-surface targeting from a safe distance. This technology…

VMM-363 and Ospreys for Japan

07/18/2013
07/18/2013: U.S. Marines with Marine Medium Tiltrotor Squadron (VMM) 363, Marine Aircraft Group 16, 3rd Marine Aircraft Wing stage nine MV-22B Ospreys for shipment to Okinawa, Japan on Naval Air Station North Island, San Diego Calif., June 12, 2013. Staging the Osprey completed the second phase for their shipment to…

An Update on F-35 Maintenance: The USAF at Eglin Works the Challenges and Receives Recognition

07/17/2013
2013-07-17 The F-35 is built around a new maintenance approach.  The computer-based system is designed to facility a global supply system with significant advantages for improvements in sortie generation rates and global supportability.  But like any new system, the effort is a work in progress. With the declaration of entry into…

Marines Demonstrate Bridging Capabilities

07/17/2013
07/27/2013: Marines serving with 1st Combat Engineer Battalion and 7th Engineer Support Battalion demonstrated the bridging capabilities of the Improved Ribbon Bridge and Armored Vehicle-Launched Bridge to various 1st Marine Division leaders aboard Camp Pendleton, May 16, 2013.  Credit:1st Marine Division:5/20/13

USS Kearsarge Flight Deck Time Lapse

07/17/2013
07/17/2013: A time-lapse of aircraft assigned to Marine Medium Tiltrotor Squadron (VMM) 266 (Reinforced). 26th Marine Expeditionary Unit (MEU), and U.S. Navy MH-60s assigned to USS Kearsarge (LHD 3) on the flight deck of the USS Kearsarge, at sea, July 13, 2013.  The 26th MEU is a Marine Air-Ground Task…