The F-35 Seat’s Enhanced Maintainability

11/18/2010
An Interview With Armando Martinez 11/18/2010 - During a visit to the Lockheed Martin F-35 facility mid-September, “Mondo” Martinez was interviewed with regard to the new seat in the F-35, which represents an important increase in maintainability.  On average, what takes the F-16 maintainers more than three hours to do…

An Update on the Eglin F-35 Training Facility

11/18/2010
An Interview With Colonel Arthur Tomassetti 11/18/2010 - In October 2010, Second Line of Defense visited the F-35 training facility located at Eglin AFB. This is a return visit with the first report emanating from a January 2010 visit.  This report provides an update on progress at the training facility,…

F-35: “Fighting And Sustaining As A Team”

11/06/2010
Shaping a Fleet Sustainment Strategy For The Next Generation Fighter Pilots An Interview With General Art Cameron (Ret.), Director, F-35 Global Sustainment Customer Alignment, Lockheed Martin Aeronautics Company SLD, September 2010 11/06/2010 - During a visit to the Lockheed Martin F-35 facility in September 2010, SLD sat down with (Retired)…

Preparing for the Maintenance of the F-35 at Langley AFB

11/05/2010
An Interview with Senior Master Sgt. Steven Wehrle and Master Sgt. David Freeman 11/05/2010 - In September 2010, Second Line of Defense sat down with maintainers at Langley AFB to talk about F-22 experiences and preparation for the F-35.  As the maintainers described it, a significant cultural change was underway…

“Re-norming” the Asymmetric Advantage (Part Two)

10/17/2010
“Re-norming” the Asymmetric Advantage in Air Dominance: “Going to War with the Air Force You Have” (Part Two) By Michael W. Wynne, 21st Secretary of the U.S. Air Force 10/17/2010 What are the available platforms and technologies that we have invested in to date? And how can we shape effective…

Crafting Relevant Capabilities

10/16/2010
Arms Sales a Necessary, But Not Sufficient Condition for Enhanced Deterrence By Dr. Robbin Laird 10/16 /2010 - Richard Weitz’s review and assessment of the proposed Saudi arms sale discusses some of the platforms on offer, which could go with what the Saudis already have in the inventory.  Platforms are…

The T/R Module Production Base for the F35 Lightning II’s Radar

09/07/2010
An Interview With Douglas Lawton, vice president, Baltimore Manufacturing, Northrop Grumman Electronic Systems In early July, Second Line of Defense talked with Douglas Lawton, a conversation prompted by an SLD visit to the Northrop Grumman plant to watch the transmit and receive (or T/R) module production line : this line…